Overall Inspection Scheme Of Steel Rail

Date: 2022-03-17 Browse: 6062

Regular inspection of the steel rail is the basis of its maintenance. Any plan for steel rail maintenance is specified based on the results of regular inspection. The inspection of steel rail shall be consistent with the actual situation on site, and the scheme shall be careful and reasonably arranged to complete the early detection and early report of steel rail problems.

As for the maintenance department of steel rail culvert, it manages multiple points and long lines in the line section. In order to ensure that no points and lines are omitted in the inspection process, a person with strong sense of obligation and high business technology is elected as the team leader in the process of steel rail inspection, and the steel rail road is segmented and the obligations are subcontracted to people, so as to avoid the phenomenon of deception. In the process of steel rail inspection, temporary inspection shall be separated from regular inspection, and special inspection shall be separated from regular inspection. The bridge and tunnel equipment and the open bridge surface, bearing and beam body of steel beams that directly affect the traffic safety shall be inspected frequently; The hybrid bridge and other important bridge and tunnel equipment shall also be inspected every month. The parts of the steel rail that often show defects shall be mainly inspected, and careful records shall be made in the inspection


$news_info.title

+

+

Contacts