Instructions for Hydraulic Rail Track Lifting And Lining Machine

Date: 2021-06-23 Browse: 6171

Today I will share with you the instructions for the rail track lifting and lining machine.

Hydraulic Rail Lifting and lining machine structure is reasonable.Whiile hydraulitc system falls down.Manual pump can be used to operate or moved the machine off-track to ensure safe operation.The open & close of the rail hook happens at the same time while the up & down of the main frame takes place to depending on the rail weight simply,reliably and safely...


1. Loosen the vent valve of the hydraulic part, open the oil return valve, apply moderate pressure on the top post or side hook to lower it to the lowest position, and then close the lift oil return valve for standby.


2. Insert the side hook of the road rail track lifting and lining machine horizontally into the position where the road needs to be started, and the top column is perpendicular to the ground, insert the joystick into the handle hole, slowly press the joystick to make the plunger pump core reciprocate, and the side hook Drive the rail upwards to achieve the purpose of starting, place a suitable wooden block under the lifted rail, slowly open the oil return valve, let the rail go down to the wooden block, and appropriately spin down the top column or side hook of the machine to let the machine Reset, close the oil return valve, tighten the vent valve, and remove the lifting machine.

$news_info.title

+

+

Contacts